The lost wax method of the bronze
Strict process chinese bronze sculpture quality, to ensure that once acceptance, reduce or eliminate rework once the good quality of bronze, access to the shortening of the duration. Han Dynasty is the transition period of the bronze. To ensure that the duration is complete, we will choose a high professional quality of the bronze team approach to bear bronze task, the team from my unit fixed bronze technical team, has a good basis for cooperation, bronze and technical personnel is relatively stable, will not holidays or the busy season which led to labor shortage, so powerful and timely labor protection.
To ensure that the construction period, reducing the labor intensity, we will maximize the level of mechanization nude statues, such as concrete mixing, mortar mixer crane transport equipment, and professional type of work with a minicomputer. The bronze developed from dignified and solemn sacrificial bronze sculptures to plain and practical appliances. These are completed the program, a strong guarantee. The project implementation of a dedicated system to prevent the bronzes because of funding problems affecting the progress of the works, and fully guarantee the labor, machinery, fully equipped with the timely approach of the material. Earmarked funding of this project with the completion of the various stages of the project date, be honored in a variety of materials, equipment, and professional teams such as labor costs, financial and material resources, human, bronze projects to provide a guarantee.
Effective organization and management, process control, process arrangements, the application of advanced technology, the duration of the planning and control of management by objectives is the key to the guarantee period, guarantee of funds, timely organization of the machinery and equipment, materials, engineering bronze sculptures personnel entering the labor force to co-ordinate The arrangement is the duration to ensure the basic conditions. Strict site management system is an important means for ultimate realization of the construction period goals. According to the requirements of the tender documents for the duration, the project work content and duration of the annex. It is known from the excavation of this bronze, as early as the 5th century BC.
Establish a regular meeting system: monthly production will be held to do the stage summary; weekly project regular meeting, arrange check the weeks progress; month inspections will check the progress of the operation, weekly and monthly reports to control the layers of implementation of the guarantee scheme. The lost wax method of the bronze has reached a high level in China. Affect the progress and professional coordination of the bronzes in the regular meeting must be promptly resolved, the preparation of bronze schedule should also be prepared, resources need dosage plan, the plan of the flow of funds programs, materials, components and parts processing, shipping and sent to track Check supplies to ensure that.
To ensure the plan is completed, we will send the project manager served as a similar project as a project manager for the project, the comrades rich china bronze statue of the site management organization selected an experienced, energetic project person in charge of in at the scene. Implementation of the project bronzes technology management. Han dynasty is one of the essential dynasties stressing in the bronze over the course of historical development of China. Make full use of space, time, application of water-band equalizer bronze process, reasonable arrangements for the process to ensure the safety and quality on the premise of the Bronze, full use of the bronze sculpture space and climatic conditions, and scientific organizations interchange operations.